Traffic

Click to Interact
Type
Location
Description
Time
incident
Everett TpkeNB
Road construction in Nashua on Everett Turnpike NB between RT-101A-BYP/Exit 8 and Industrial Dr/Exit 10, slow traffic back to US-3/RT-101A/Amherst St/Exit 7
incident
RT-24NB
Crash in Raynham on RT-24 NB at EX 22 - I-495
incident
I-90EB
Disabled vehicle. Left shoulder blocked in Westborough on Mass Pike EB near EX 106 - I-495. Reported by Police
incident
I-293NB
Accident. Shoulder blocked in Manchester on Rt 293 NB after RT-3A/Exit 7 (NB). Reported by Police
incident
I-93NB
Crash in Boston on Expressway NB after EX 15B - Mass Ave (NB)
construction
RT-3ASB
Road construction in Hingham on Rt 3A SB between Hwy 228/East St and Old Oaken Bucket Rd/Driftway
construction
Memorial DrWB
Road construction. Left lane closed in Cambridge on Memorial Dr WB before Audrey St
construction
RT-1ANB
Road construction. Roadway reduced to one lane in Salem on Rt 1A NB between Hwy 114/New Derby St/Lafayette St and RT-22/Cabot St
construction
Memorial DrEB
Road construction. Both travel lanes closed in Cambridge on Memorial Dr EB after Audrey St
flow
Orange LineBoth NB/SB
Shuttle service operating in Boston on MBTA Subways: Orange Line NB/SB between Back Bay and Forest Hills
construction
I-90EB
Road construction. Right lane closed in Boston on Mass Pike EB between Fenway Park and Prudential Tunnel
construction
RT-1ABoth NB/SB
Bridge replacement. Roadway reduced to one lane during work hours in Hampton on RT 1A NB/SB at Hampton River Bridge. Reported by -- NH DOT
event
I-91Both NB/SB
Traffic flowing freely in Windham on I-91 NB/SB between US-5/VT-103/Exit 6 and United States/Canada Border
construction
I-295Both NB/SB
Road construction. Roadway reduced to two lanes in Cumberland on I 295 NB/SB at EX 20 - Mendon Rd
construction
I-495Both NB/SB
Long-term road construction in Hopkinton on Rt 495 NB/SB at EX 58 - I-90/Mass Pike
construction
I-95SB
Off-ramp closed due to construction in Lexington on RT 95 SB off-ramp to WB EX 46 - Rt-2A
construction
I-90WB
Road construction. Right lane closed in Boston on Mass Pike WB between Prudential Tunnel and Fenway Park
construction
I-495Both NB/SB
Long-term road construction in Andover on Rt 495 NB/SB near EX 99 - Rt-28. Reported by MassDOT
construction
RT-18NB
Off-ramp closed in New Bedford on RT-18 NB off-ramp to WB Rt 195
construction
I-195WB
Off-ramp closed in New Bedford on I 195 WB off-ramp to SB Exit 26 - RT-18

Latest Traffic Stories